CIL, CILA, SCIA, Building Permit and fitness for use: we choose the right procedure for your works and follow it through to the end.

Building permits

Building procedures: the right route for your works

Before renovating, extending or building, you need to understand which building procedure is required. The choice depends on the type of works, the area where the property is located and any constraints. In Tuscany, regional law 65/2014 and your municipality’s building regulations are added to the national rules (Presidential Decree DPR 380/2001).

Studio Gianchecchi follows the procedure from start to finish: checking the property, design, submission to the municipality and closing of the works.

The main building procedures

  • Free building works (edilizia libera): for ordinary maintenance, such as painting, repairs and replacing floors and wall coverings, no procedure is needed, unless there are constraints or specific municipal rules;
  • Notice of Start of Works (CIL): for temporary or seasonal works to be removed within 180 days;
  • Certified Notice of Start of Works (CILA): for extraordinary maintenance without structural works, such as moving partition walls or redoing a bathroom and systems;
  • Certified Notice of Start of Activity (SCIA): for works on structures, restoration with structural works and renovations that do not require a Building Permit;
  • Building Permit (PdC): for new constructions, extensions and larger renovations;
  • Landscape authorisation or Heritage Authority (Soprintendenza) authorisation: added to the building procedure when the property is subject to constraints;
  • End of works notice and Certified Notice of Fitness for Use (SCA): they close the procedure when the works are finished.

If the property has discrepancies compared with the approved plans, a retrospective regularisation (sanatoria) may be needed before the works. With the Salva Casa Decree, some minor discrepancies are easier to regularise.

Why a well-prepared procedure matters

  • You avoid penalties and suspensions: works carried out without the correct title are unauthorised building works;
  • You keep the property in order: sale, mortgage and succession require the actual state to match the building titles;
  • You access the tax incentives: for tax deductions you need the right procedure and complete documentation;
  • You save time: a complete application avoids requests for additional documents and delays.

How we work

  • Site visit and check of the property’s documents: building titles, land registry and constraints;
  • Choice of the most suitable procedure and estimate of times and costs;
  • Design, technical reports and certifications;
  • Submission to the municipality and to the other bodies, with replies to any requests for additional documents;
  • End of works, land registry update and fitness for use, when needed.

For structures and systems we work with trusted engineers and technicians: you have a single point of contact for the whole procedure.

Frequently asked questions

What is a building application?

A building application is the set of documents (design, reports and forms) submitted to the municipality in order to carry out works on a property: new constructions, renovations, extensions or changes to existing buildings.

What are the main types of building procedures?

The main types of building procedures are:

  • Retrospective regularisation (sanatoria) of building works, to regularise works carried out without the necessary authorisations;
  • Building Permit, for new constructions, major renovations and extensions;
  • Certified Notice of Start of Works (CILA), for extraordinary maintenance without structural works, such as internal changes;
  • Certified Notice of Start of Activity (SCIA), for works on structures and renovations that do not require a Building Permit.
When is a building procedure needed?

A building procedure is needed for all works that go beyond ordinary maintenance: internal changes, works on structures, extensions, new constructions and renovations.

The scale of the works determines the type of procedure to be submitted.

How long does it take to obtain approval of a building procedure?

It depends on the type of procedure. With the CILA and the SCIA the works can start on the day of submission; for the SCIA the municipality then has 30 days to carry out its checks.

For the Building Permit, however, the times can reach 60-90 days, depending on the complexity of the works and the checks required.

Which documents are needed to submit a building procedure?

The following are generally required:

  • Land registry documents of the property;
  • Identity documents of the owner and of the professional;
  • Technical certifications by the professional in charge;
  • Technical design of the works (prepared by the professional);
  • Any specific authorisations, such as the landscape authorisation or the clearance (nulla osta) for archaeological constraints.
What happens if works are carried out without a building procedure?

Carrying out works without the required authorisations is considered unauthorised building work, with administrative and criminal consequences. It may be necessary to pay a fine, suspend the works or even demolish the unauthorised works.

Can I apply for tax incentives for building works?

Yes, tax deductions are available for many works, such as the Bonus Casa (Home Bonus) for renovations and the Ecobonus for energy savings. In 2026 they are worth 50% on the owner’s main residence and 36% in other cases. To access these incentives you must meet specific requirements and submit the correct documentation.